Construction of collector II, collector VII and main pipeline

BASIC INFORMATION ABOUT BUILDING:
  • Location: Subotica
  • Pipe type & Diameter: Ductile DN 1600, 1400, 800, 500, 400, 300, 250, GRP (Hobas) DN 1600, 900, 600, 500, 700, 800, PVC DN 400, 315, 200, PE DN 110 (mm) in length L = 12,500.0m
  • Work Execution: 2014
  • Employer: PUBLIC UTILITY COMPANY “Vodovod i kanalizacija”, Subotica