WORKS ON EXCAVATION, REDUCTION OF GROUND WATER LEVEL AND CONSTRUCTION OF SUPPORTING STRUCTURE FOR SECURING THE FOUNDATION PIT RELATED TO THE PERFORMANCE OF WORKS ON THE CONSTRUCTION OF “SCIENCE AND TECHNOLOGICAL PARK” IN NOVI SAD (PHASE 1)
BASIC INFORMATION ABOUT BUILDING:
Site Location: Novi Sad
Description: construction works on excavation, protection of excavation, production of base concrete and lowering of groundwater level