CONSTRUCTION OF WASTEWATER TREATMENT PLANT IN BACKA TOPOLA

1. CONSTRUCTION OF LIDL RS RETAIL FACILITY IN BEČEJ

Site Location: Danila Kiša Street No 10a, Bečej Description: Construction of a retail facility according to the “turnkey” system. The Building has a ground floor with a total gross area of 2191.30 m², a total net area of 2056.27 m², a height of 6.90 m (5.90 m). The classification number of the facility is 123002, […]
WORKS ON CONSTRUCTION OF MISSING FACILITIES AT BORDER CROSSING NAKOVO

RECONSTRUCTION AND UPGRADE OF BREŠJE WATER TREATMENT PLANT IN ALEKSINAC

CONSTRUCTION OF WATER TREATMENT PLANT II WITH AUXILIARY WORKS IN SUBOTICA SWUP III

CONSTRUCTION OF NGC1- NEW MAIN PUMPING STATION NEAR ŽEŽEL’S BRIDGE (PHASE I) WITH ACCOMPANYING FACILITIES- TRANSFORMER STATION AND CONTROL COMMAND CENTER

INFRASTRUCTURE EQUIPMENT – LOCATION 19-2 (PETROL STATION CONNECTION to the EUROPE BOULEVARD)

RECONSTRUCTION AND REHABILITATION OF THE SEWERAGE SYSTEM ON THE NORTHERN PART OF PLOT 7569/1 OF THE CLINICAL CENTER OF VOJVODINA

CONSTRUCTION OF WASTE WATER TREATMENT PLANT IN BEGEČ

WORKS PERFORMANCE ON THE CONSTRUCTION OF THE INSTITUTE FOR EMERGENCY MEDICAL CARE IN NOVI SAD

PERFORMANCE OF WORKS ON RECONSTRUCTION AND UPGRADE OF WATER TREATMENT PLANT “BRESJE” IN ALEKSINAC

https://www.graditelj-ns.co.rs/wp-content/uploads/2018/01/bresje.mp4Description: reconstruction of existing facilities – distribution chambers, foculators and sedimentation tanks, filter galleries, administrative buildings; construction of new facilities – ozonation facility, floors P + 1, dimensions 21.43 × 9.8m in the base, total gross area 420m²; footbridges, with a gross area of 35.26 m2 connecting the ozonation facility with the existing facility-pipe gallery; […]
CONSTRUCTION OF FACILITIES OF THE INSTITUTE FOR EMERGENCY MEDICAL CARE CENTER IN NOVI SAD

WORKS ON EXCAVATION, REDUCTION OF GROUND WATER LEVEL AND CONSTRUCTION OF SUPPORTING STRUCTURE FOR SECURING THE FOUNDATION PIT RELATED TO THE PERFORMANCE OF WORKS ON THE CONSTRUCTION OF “SCIENCE AND TECHNOLOGICAL PARK” IN NOVI SAD (PHASE 1)

EXECUTION OF WORKS ON FOREST CUTTING IN THE FORMER NURSERY

CONSTRUCTION WORKS OF ENTRANCE AND WARDROBE RECONSTRUCTION IN BIG SHOPPING MALL AND TSPA PLANT

RECONSTRUCTION AND UPGRADE OF HEXAN EXTRACTION IN SOJAPROTEIN BEČEJ

PERFORMANCE OF WORKS ON THE CONSTRUCTION OF THE SEWERAGE NETWORK IN THE INDUSTRIAL ZONE IN KULA

CONSTRUCTION WORKS ON HEAT PIPELINES

EARTH AND SOME CONCRETE, CARPENTRY AND REINFORCEMENT WORKS ON THE INDUSTRIAL BUILDING P + 1 IN NOVA STREET IN NOVI SAD

CONSTRUCTION WORKS ON REHABILITATION OF RAINWATER SEWERAGE IN NARODNOG OSLOBODENJA STREET IN KRUPNJ

WORKS ON CONSTRUCTION OF AB CONCRETE RECEPTION PIT FOR BEET AND REPAIR OF DAMAGED PIPELINE